What the filing says
A public-record reading of the proposed work.
Propose plumbing and sprinkler works in conjunction with arch#m01380090-i1.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story condominium built in 1879, with 15 homes, on a 7,500 sq ft lot.
- Built
- 1879
- Last altered
- 2004
- Floors
- 7
- Residential units
- 15
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- M1-5/R7X
- Lot area
- 7,500 sq ft
- Building area
- 39,207 sq ft
- Historic district
- SoHo-Cast Iron Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 11 notices on file; the most recent was issued Dec 14, 2022.
- Plumbing
Issued Dec 14, 2022 — THE BOROUGH COMMISSIONER INTENDS TO REVOKE ALL FIRE SUPPRESSION APPROVALS AND PERMIT ISSUED UNDER PERMIT #M00671480 DUE TO SUSPENSION OF FIRE SUPPRESSION LICENSE # 000653 , STOP ALL FIRE SUPPRESSION WORK UNDER ABOVE MENTIONED PERMIT / MAKE SITE SAFE.
- Construction
Issued Jul 22, 1994
- Construction
Issued Jul 22, 1994
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01380090-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01380090-S2
- BBL
- 1005007506
- Postal code
- 10012 · 320 filings
- Review type
- Standard Plan Examination
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 5
- Proposed dwelling units
- 5