What the filing says
A public-record reading of the proposed work.
Interior demolition of non-load bearing partitions, ceilings, floors, finishes, elevator & boiler as per plans filed herewith. no change to use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story walk-up apartment building built in 1925, with 9 homes, on a 5,000 sq ft lot.
- Built
- 1925
- Last altered
- 1995
- Floors
- 2
- Residential units
- 9
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7-1
- Lot area
- 5,000 sq ft
- Building area
- 5,257 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 24 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Oct 31, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#3488184 VIO#090825PI20403TC DATED 09/08/25 REQUIRING OWNER TO PROVIDE A CORRECTION ACTION PLAN BY 09/22/25,START BLDG REPRS UNDER PERMIT BY 11/07/25&COMPL/SIGNED OFF BY 12/7/25 AS OF TODAY 10/31/25 A CAP&EVIDENCE OF COMPL WRK NOT REC'D IMMED COMPLY W/COMMISSIONER'S ORDER #348184 VIO#090825PI20403TC
- Construction
Issued Sep 8, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD SEPARATION OF MASONRY STAIRCASE FROM WALL @ EXP1. OBSVD BULGING AND SILODGED BRICKS BTWN 2FL WINDOWS @ EXP1. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG & TO SUBMIT A CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV BY 9/22/25. BLDG TO BE REPAIRED UNDER PERMIT STARTING 11/7/2025
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01317138-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01317138-I1
- BBL
- 2025050028
- Postal code
- 10452 · 305 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 9
- Proposed dwelling units
- 0