NYC DOB record · S01093974-I1

10A Prol Place

10A Prol Place, Staten Island, NY 10312

Alteration filing in Great Kills-Eltingville, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 30, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01093974-I1

10A Prol Place

Staten Island, NY 10312

Alteration filing · status dated Sep 28, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01093974-I1 as a alteration filing at 10A Prol Place, Staten Island, NY 10312. Its latest published status category is Approved, dated Sep 28, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 28, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 4 filings that name CSA Group NY Architects and Enginee
FiledOct 23, 2024
Current recordApproved
Proposed scaleNot specified
Recorded cost$2.2M

What the filing says

A public-record reading of the proposed work.

Provide intermittent ventilation of Pump Building Screen Room, Fan Room, Mechanical Room No.1; Electric heaters for Electrical Room, Generator Room, Future Generator Room, ATS Room, Fan Room, Mechanical Rooms No.1 and No.2, and Storage Rooms; Exhaust fan

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 1-story other built in 1990, on a 81,158 sq ft lot.

Built
1990
Floors
1
Residential units
0
Building type
Other
Zoning district
R3-1
Lot area
81,158 sq ft
Building area
15,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01093974-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01093974-I1
BIN
5110756
BBL
5054110040
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0