NYC DOB record · B00390141-P1

11 2 Place

11 2 Place, Brooklyn, NY 11231

Alteration filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00390141-P1

11 2 Place

Brooklyn, NY 11231

Alteration filing · status dated Dec 27, 2020

Current record
Approved
Proposed scale
Not stated
Dwelling units
7
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00390141-P1 as a alteration filing at 11 2 Place, Brooklyn, NY 11231. Its latest published status category is Approved, dated Dec 27, 2020. The filing records 7 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 27, 2020
Proposed scale
7 proposed dwelling units
The building, not the filingapartment sizes, the owner of record and every filing at BIN 3005131Applicant of recordSee the 1449 filings that name Ashraf Corp
FiledNov 5, 2020
Current recordApproved
Proposed scale7 units
Recorded cost$9,900

What the filing says

A public-record reading of the proposed work.

Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story condominium built in 1965, with 7 homes, on a 3,250 sq ft lot.

Built
1965
Last altered
2004
Floors
7
Residential units
7
Building type
Condominium
Land use
Walk-up apartments
Zoning district
R6B
Lot area
3,250 sq ft
Building area
9,391 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 15 notices on file; the most recent was issued Dec 3, 2020.

  • Elevator

    Issued Dec 3, 2020

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00390141-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00390141-P1
BBL
3003607501
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
7
Proposed dwelling units
7
Scaffolding