NYC DOB record · B00998383-S6

11 Avenue M

11 Avenue M, Brooklyn, NY 11230

New building filing in Mapleton-Midwood (West), Brooklyn. The latest DOB status is objections.

The examiner raised objections. The applicant has to resolve them before the filing can be approved. What every status means

Under reviewNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 4, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00998383-S6

11 Avenue M

Brooklyn, NY 11230

New building · status dated Sep 1, 2026

Current record
Under review
Proposed scale
10 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00998383-S6 as a new building at 11 Avenue M, Brooklyn, NY 11230. Its latest published status category is Under review, dated Sep 1, 2026. The filing records 10 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Under review
Latest status date
Sep 1, 2026
Proposed scale
10 proposed stories
Applicant of recordSee the 14 filings that name Fna Engineering Services PC
FiledAug 7, 2026
Current recordUnder review
Proposed scale10 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Soe filed in conjunction with nb b00998383-i1

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 1-story warehouse built in 1928, on a 27,911 sq ft lot.

Built
1928
Last altered
1991
Floors
1
Residential units
0
Building type
Warehouse
Land use
Industrial and manufacturing
Zoning district
C8-2
Lot area
27,911 sq ft
Building area
29,550 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 14 open notices on record for this building, out of 16 notices on file; the most recent was issued Dec 1, 2024.

  • Failure to post energy

    Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to

    Issued Aug 2, 2024 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • Failure to

    Issued May 2, 2024 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • 11 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00998383-S6.

    01
  2. Current status updated

    The latest recorded filing status is “Objections.”

    02

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00998383-S6
BIN
3131015
BBL
3054950601
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
10
Existing dwelling units
Empty in the source
Proposed dwelling units
0