NYC DOB record · M01372962-I1

11 East 26 Street

11 East 26 Street, Manhattan, NY 10010

Alteration filing in Midtown South-Flatiron-Union Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01372962-I1

11 East 26 Street

Manhattan, NY 10010

Alteration filing · status dated Sep 9, 2026

Current record
Approved
Proposed scale
21 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01372962-I1 as a alteration filing at 11 East 26 Street, Manhattan, NY 10010. Its latest published status category is Approved, dated Sep 9, 2026. The filing records 21 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 9, 2026
Proposed scale
21 proposed stories
Complete building dossierView all 16 filings associated with BIN 1016876Applicant of recordSee the 17 filings that name John F. Giuseffi, Architect, PC
FiledMar 26, 2026
Current recordApproved
Proposed scale21 stories
Recorded cost$300,000

What the filing says

A public-record reading of the proposed work.

Office renovation on 11th flr. work to include partition, ceiling, and door modifications as indicated on plans. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 21-story office building built in 1913, on a 11,553 sq ft lot.

Built
1913
Last altered
1979
Floors
21
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-2
Lot area
11,553 sq ft
Building area
217,991 sq ft
Historic district
Madison Square North Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 111 notices on file; the most recent was issued Mar 19, 2024.

  • Hazardous condition (facade)

    Issued Mar 19, 2024 — CYCLE 9A UNSAFE REPORT FILED

  • Failure to post energy

    Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • No report and / or late filing (facade)

    Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

  • 4 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 12, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01372962-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01372962-I1
BBL
1008560009
Review type
Professional Certification
Existing stories
21
Proposed stories
21
Existing dwelling units
0
Proposed dwelling units
0
General construction