NYC DOB record · M00981690-I1

11 North Moore Street

11 North Moore Street, Manhattan, NY 10013

Alteration filing in Tribeca-Civic Center, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00981690-I1

11 North Moore Street

Manhattan, NY 10013

Alteration filing · status dated Nov 19, 2026

Current record
Approved
Proposed scale
9 stories
Dwelling units
18
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00981690-I1 as a alteration filing at 11 North Moore Street, Manhattan, NY 10013. Its latest published status category is Approved, dated Nov 19, 2026. The filing records 9 proposed stories and 18 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 19, 2026
Proposed scale
9 proposed stories and 18 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 1002169Applicant of recordSee the 15 filings that name Madsen Consulting Engineering
FiledJan 2, 2024
Current recordApproved
Proposed scale9 stories
Recorded cost$249,998

What the filing says

A public-record reading of the proposed work.

Structural work for roof pergola and deck as per plans. no change of use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 9-story condominium built in 2013, with 18 homes, on a 11,206 sq ft lot.

Built
2013
Floors
9
Residential units
18
Building type
Condominium
Land use
Elevator apartments
Zoning district
C6-2A
Lot area
11,206 sq ft
Building area
59,134 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00981690-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00981690-I1
BBL
1001907509
Review type
Standard Plan Examination
Existing stories
9
Proposed stories
9
Existing dwelling units
18
Proposed dwelling units
18
Structural work