What the filing says
A public-record reading of the proposed work.
Sprinler modifications taking place on the 4th floor as per drawings filed herewith. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 26-story office building built in 1926, on a 57,675 sq ft lot.
- Built
- 1926
- Floors
- 26
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C6-6
- Lot area
- 57,675 sq ft
- Building area
- 1,103,075 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 240 notices on file; the most recent was issued Mar 12, 2026.
- Construction
Issued Mar 12, 2026 — FTM BLDG. OBSERVED AT ROOF PARAPET BRICKWORK, SPALLING AND CRACKED MASONARY, DETERIORATING BRICK. AT EXPOSURE 2 NORTH ELEVATION CRACKED AND SPALLING MORTAR JOINTS. REMEDY: REPAIR AND/OR REPLACE DEFECTIVE CONDITIONS. 6
- Construction
Issued Mar 12, 2026 — EWO DUE TO IMMEDIATELY HAZARDOUS CONDITION. AT NE CORNER OF PARAPET/ CORNICE ON EXPS 2 & 3. DAMAGED SPALLING MORTAR @ CORNICE NE END OF CORNICE. REMEDY: AS PER NYC 28-302-5 OWNER ARE OBLIGATED TO SECURE PUBLIC SAFE OF DAMAGED BLDG FACADE. HAZARDOUS CONDITION @ ROOF CORNICE SAFE MEAS PUT IN PLACE. REMOVE ALL LOOSE MATERIALS U/DIR LIC. PROF
- (other bldgs types) - elevator affirmation of
Issued Nov 14, 2016 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01270413-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01270413-I1
- BBL
- 1008070001
- Postal code
- 10001 · 394 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0