What the filing says
A public-record reading of the proposed work.
Filing for Temp Standpipe in conjunction with NB# M01164499-I1
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a vacant land on a 18,070 sq ft lot.
- Last altered
- 2001
- Residential units
- 0
- Building type
- Vacant land
- Land use
- Vacant land
- Zoning district
- C6-2
- Lot area
- 18,070 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 58 notices on file; the most recent was issued Nov 1, 2023.
- Failure to correct swarmp conditions (facade)
Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS
- Construction
Issued Mar 2, 2023 — EMERGENCY WORK ORDERDUE TO UNSAFE CONDITIONS ON FACADE SUCH AS LOOSE/ HANGING METAL ON EXPOSURE#1(SO.14 STREET)SPALLED TERRA COTTA ON EXP#2 (WEST),LG.STEPCRACKED/DISPLACED BRICKS@EXP#2(WEST),CRACKED&DETERIORATE BRICK/STUCCO ON EXP#3(NO.)REMEDY:IMMED TAKE & PROVIDE SAFETY MEASURES TO SECURE&PROTECT PUB..MAKE IMMED.REPAIRS UNDER SUPERV.OF A LIC.PROFF
- Hazardous condition (facade)
Issued Feb 17, 2023 — CYCLE 9B UNSAFE REPORT FILED
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01164499-S9.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01164499-S9
- BIN
- 1091959
- BBL
- 1005770034
- Postal code
- 10011 · 456 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- 30
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 34