What the filing says
A public-record reading of the proposed work.
Building out interior partitions with new ceilings and floorings
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story factory or industrial building built in 1909, on a 37,492 sq ft lot.
- Built
- 1909
- Floors
- 4
- Residential units
- 0
- Building type
- Factory or industrial building
- Land use
- Industrial and manufacturing
- Zoning district
- M1-2/R6
- Lot area
- 37,492 sq ft
- Building area
- 64,200 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 48 notices on file; the most recent was issued Jan 3, 2017.
- (other bldgs types) - elevator affirmation of
Issued Jan 3, 2017 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
- Construction
Issued Jan 9, 2001 — HAZARDOUS
- Construction
Issued Dec 13, 2000 — WORK WITHOUT A PERMIT. WORK NOTED: FULL PARTITIONS ERECTED AT 4TH FLR LEVEL CREATING ROOMS, PARTITIONS ALSO ERECTED AT CELLAR CREATING OFFICE & ROOM REMEDY: OBTAIN A PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01370382-I1.
- Current status updated02
The latest recorded filing status is “Prof Cert QA Review.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,692 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01370382-I1
- BBL
- 3000660018
- Postal code
- 11201 · 6451 filings
- Review type
- Professional Certification
- Existing stories
- Source value under review
- Proposed stories
- Source value under review
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








