NYC DOB record · M01083130-I1

1100 Park Avenue

1100 Park Avenue, Manhattan, NY 10128

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01083130-I1

1100 Park Avenue

Manhattan, NY 10128

Alteration filing · status dated Sep 29, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
75
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01083130-I1 as a alteration filing at 1100 Park Avenue, Manhattan, NY 10128. Its latest published status category is Recorded as completed, dated Sep 29, 2026. The filing records 75 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 29, 2026
Proposed scale
75 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 1046974Applicant of recordSee the 26 filings that name P.A. Collins PE
FiledJan 15, 2025
Current recordRecorded as completed
Proposed scale75 units
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

This Mechanical Systems application is being filed for heating & air conditioning system installation and toilet exhaust in conjunction with M01082946

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 18-story elevator apartment building built in 1930, with 75 homes, on a 18,600 sq ft lot.

Built
1930
Last altered
1980
Floors
18
Residential units
75
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
18,600 sq ft
Building area
244,935 sq ft
Historic district
Park Avenue Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01083130-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01083130-I1
BBL
1015010033
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
75
Proposed dwelling units
75