NYC DOB record · B00474267-I1

1102 Coney Island Avenue

1102 Coney Island Avenue, Brooklyn, NY 11230

Alteration filing in Flatbush (West)-Ditmas Park-Parkville, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00474267-I1

1102 Coney Island Avenue

Brooklyn, NY 11230

Alteration filing · status dated Jan 29, 2025

Current record
Recorded as completed
Proposed scale
4 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00474267-I1 as a alteration filing at 1102 Coney Island Avenue, Brooklyn, NY 11230. Its latest published status category is Recorded as completed, dated Jan 29, 2025. The filing records 4 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Jan 29, 2025
Proposed scale
4 proposed stories
Complete building dossierView all 2 filings associated with BIN 3170241Applicant of recordSee the 13 filings that name Richard H.GREEN,PE
FiledMay 28, 2021
Current recordRecorded as completed
Proposed scale4 stories
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

To install a sign structure for a non-illuminated wall advertising sign. sign filed under another application. no change in use, egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story office building built in 1993, on a 16,200 sq ft lot.

Built
1993
Floors
4
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C8-2
Lot area
16,200 sq ft
Building area
63,468 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 13 open notices on record for this building, out of 57 notices on file; the most recent was issued Apr 22, 2023.

  • Failure to submit

    Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)

  • Failure to submit

    Issued Aug 21, 2022 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)

  • Failure to post energy

    Issued Dec 1, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 10 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00474267-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00474267-I1
BBL
3064980030
Review type
Professional Certification
Existing stories
4
Proposed stories
4
Existing dwelling units
0
Proposed dwelling units
0
Structural work