What the filing says
A public-record reading of the proposed work.
Montefiore - lab 9 - modifications of partitions, ceiling, doors plus connecting bridge addition according to plans filed herewith. no change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 10-story health facility built in 1972, on a 362,600 sq ft lot.
- Built
- 1972
- Last altered
- 1996
- Floors
- 10
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R7-1
- Lot area
- 362,600 sq ft
- Building area
- 895,256 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 42 notices on file; the most recent was issued May 20, 2019.
- Non-residential elevator periodic
Issued May 20, 2019 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
- Construction
Issued Jun 7, 1993
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 12, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01223468-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01223468-I1
- BIN
- 2096399
- BBL
- 2033270001
- Postal code
- 10467 · 113 filings
- Review type
- Standard Plan Examination
- Existing stories
- 8
- Proposed stories
- 8
- Existing dwelling units
- 0
- Proposed dwelling units
- 0