What the filing says
A public-record reading of the proposed work.
Installation of temporary shoring and sidewalk vault repair as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story garage or fuel station built in 1930, on a 5,108 sq ft lot.
- Built
- 1930
- Last altered
- 1983
- Floors
- 4
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- R8B
- Lot area
- 5,108 sq ft
- Building area
- 19,432 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 20 notices on file; the most recent was issued May 24, 2023.
- Construction
Issued May 24, 2023 — OBSERVED CELLAR LEVEL CONCRETE CEILING INSTATE OF DISREPAIR CONDITIONS INCLUDING CRACKS, SPALLING, SECTION MISSING WITH EXPOSED & ROTTEN RE-BARS THROUGHOUT. CRACKS ON INTERIOR CONCRETE FLOORS CELLAR TO 4TH FLOOR LEVEL AND EXTERIOR DISREPAIR BRICK WALL & WOODEN WINDOW FRAMES. INSTALLED ADJUSTABLE SCREW JACKS TO SUPPORT CELLAR CEILING.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01480605-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 90,393 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01480605-I1
- BBL
- 1015110006
- Postal code
- 10028 · 673 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 0
- Proposed dwelling units
- 0