NYC DOB record · B00269858-I1

111 Woodruff Avenue

111 Woodruff Avenue, Brooklyn, NY 11226

Alteration filing in Flatbush, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00269858-I1

111 Woodruff Avenue

Brooklyn, NY 11226

Alteration filing · status dated Dec 27, 2020

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
43
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00269858-I1 as a alteration filing at 111 Woodruff Avenue, Brooklyn, NY 11226. Its latest published status category is Recorded as completed, dated Dec 27, 2020. The filing records 43 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Dec 27, 2020
Proposed scale
43 proposed dwelling units
The building, not the filingthe owner of record and every filing at BIN 3115914Applicant of recordSee the 178 filings that name Rise Architecture
FiledDec 2, 2019
Current recordRecorded as completed
Proposed scale43 units
Recorded cost$29,000

What the filing says

A public-record reading of the proposed work.

Apt 3a- replace on existing roughing: 1 lav, 1 res sink, 1 toilet, 1 tub. new: 1 dishwasher, 1 washing machine. apt 3b- relocate on new roughing: 1 lav, 1 toilet, 1 tub. replace on existing roughing:1 res sink. new: 1 dishwasher, 1 washing machine

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a elevator apartment building built in 1960, with 45 homes, on a 17,573 sq ft lot.

Built
1960
Last altered
2019
Residential units
45
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7A
Lot area
17,573 sq ft
Building area
39,312 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 31 notices on file; the most recent was issued Feb 22, 2024.

  • No report and / or late filing (facade)

    Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024

  • Failure to post energy

    Issued Apr 29, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • (other bldgs types) - elevator affirmation of

    Issued Jan 3, 2017 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00269858-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04
  5. Current status updated

    The latest recorded filing status is “LOC Issued.”

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00269858-I1
BBL
3050530026
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
43
Proposed dwelling units
43
plumbing