What the filing says
A public-record reading of the proposed work.
Provide new supply domestic water, sanitary, vent & gas piping and all related appurtenances to new plumbing fixtures & equipement with new gas meter and new water heater as shown on plans.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 19-story elevator apartment building built in 2001, with 331 homes, on a 28,302 sq ft lot.
- Built
- 2001
- Floors
- 19
- Residential units
- 331
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C6-4A
- Lot area
- 28,302 sq ft
- Building area
- 419,639 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 110 notices on file; the most recent was issued Aug 12, 2026.
- Plumbing
Issued Aug 12, 2026 — I OBSERVED ROOFTOP WATER TOWER LEAKING ONTO ROOF AT TIME OF INSPECTION WHICH IS IN VIOLATION OF PC 102.3.
- Elevator
Issued Nov 2, 2007
- Construction
Issued Jun 7, 1994
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01345535-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01345535-I1
- BBL
- 1001700020
- Postal code
- 10013 · 385 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 329
- Proposed dwelling units
- 329