What the filing says
A public-record reading of the proposed work.
Installation of new sidewalk shed with pipe scaffold at 112 east 98th street, manhattan, as per plans. there will be no change in the use, egress, or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1910, with 15 homes, on a 2,523 sq ft lot.
- Built
- 1910
- Floors
- 5
- Residential units
- 15
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7-2
- Lot area
- 2,523 sq ft
- Building area
- 9,335 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 6 notices on file; the most recent was issued Sep 6, 2023.
- Construction
Issued Sep 6, 2023 — FTM.FEU OBSERVED VARIOUS CRACKS ON EXP1, EXP4, AND THROUGHOUT THE INTERIOR COMMON SPACES.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER #3431000 (081623FEU11001ZT)TO REPAIR THE BUILDING UNDER PERMIT
- Construction
Issued Aug 16, 2023 — FTM.FEU OBSERVED VARIOUS CRACKS ON EXP 1, EXP 4, AND THROUGHOUT THE INTERIOR COMMON SPACES.IMMED RTAIN NYS PE TO EVAL THE ENT BLDG,DTRMINE THE STRCTRL STBILITY&PREPARE/FILE RPAIR DRWNGS.BLDG TO BE RPAIRD UNDR PRMT
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01446484-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 67,630 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01446484-I1
- BIN
- 1051747
- BBL
- 1016250068
- Postal code
- 10029 · 225 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 15
- Proposed dwelling units
- 15