What the filing says
A public-record reading of the proposed work.
Filed herewith plumbing work type in conjunction with application #q01464558-i1.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2.5-story one-family home built in 1925, on a 3,100 sq ft lot.
- Built
- 1925
- Floors
- 2.5
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R2
- Lot area
- 3,100 sq ft
- Building area
- 1,880 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 16, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Nov 24, 2025.
- Construction
Issued Nov 24, 2025 — FAILURE TO MAINTAIN BLDG DUE TO FIRE.BUILDING SUFFERED A 1-ALARM FIRE ON 11/23/2025.APPROX 25% OF THE 1STFL JOIST HAVE MINOR FIRE.FIRE DAMAGE OBSERVED TO FINISHES THROUGHOUT @CELLAR&1STFL LEVELS.1.NYSPE STRCTRL ENG TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR RPAIRS BY 3/2/26,3.OBTN PRMT(S) STRT WRK BY 3/16/26
- Construction
Issued Nov 23, 2025 — STRUCTURE RENDERED NON COMPLIANT DUE EXTENSIVE FIRE, SMOKE AND WATER DAMAGE THROUGHOUT STRUCTURE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01464558-S2.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01464558-S2
- BBL
- 4109970011
- Postal code
- 11412 · 80 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








