What the filing says
A public-record reading of the proposed work.
Mechanical means submitted for use of mechanical equipment and use of chute at the time of demolition in conjunction with the demo application
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story mainly residential with some commercial built in 1900, with 4 homes, on a 2,663 sq ft lot.
- Built
- 1900
- Last altered
- 2009
- Floors
- 4
- Residential units
- 4
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- C6-2A
- Lot area
- 2,663 sq ft
- Building area
- 8,317 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 7 notices on file; the most recent was issued Sep 29, 2026.
- Construction
Issued Sep 29, 2026 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD AT EXP1 TOP LEFT 4FL STONE WINDOW LINTEL W/DETERIORATION/SPALLING,ALSO TWO WINDOW LINTELS DOWN BELOW HAVE HAORLINE CRACKS PRESENT. OWNER TO RETAIN NYSPE TO EVAL THE ENTIRE BLDG, PREPARE/FILE REPAIR DWGS, REPAIR BLDG UNDER BLDG, START OWRK BY 11/30/2026
- Construction
Issued Aug 4, 2020 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION, DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO STOREFRONT DUE TO ADJACENT BUILDING ( 100 EAST 12 STREET MN ) WALL COLLAPSED AT 113 EAST 12 STREET MANHATTAN.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01397321-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01397321-S1
- BBL
- 1005580047
- Postal code
- 10003 · 1346 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- Empty in the source
- Existing dwelling units
- 4
- Proposed dwelling units
- Empty in the source