113 East 12 Street

113 East 12 Street, Manhattan, NY 10003

Full demolition filing in East Village, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedFull demolition

NYC Department of Buildings · w9ak-ipjd · accessed Oct 7, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01397321-S2

113 East 12 Street

Manhattan, NY 10003

Full demolition · status dated Oct 5, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01397321-S2 as a full demolition at 113 East 12 Street, Manhattan, NY 10003. Its latest published status category is Approved, dated Oct 5, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Full demolition
Latest status
Approved
Latest status date
Oct 5, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1009027Applicant of recordSee the 359 filings that name Mchenery Testing Lab
FiledOct 2, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$12,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.

Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story mainly residential with some commercial built in 1900, with 4 homes, on a 2,663 sq ft lot.

Built
1900
Last altered
2009
Floors
4
Residential units
4
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
C6-2A
Lot area
2,663 sq ft
Building area
8,317 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 7 notices on file; the most recent was issued Sep 29, 2026.

  • Construction

    Issued Sep 29, 2026 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD AT EXP1 TOP LEFT 4FL STONE WINDOW LINTEL W/DETERIORATION/SPALLING,ALSO TWO WINDOW LINTELS DOWN BELOW HAVE HAORLINE CRACKS PRESENT. OWNER TO RETAIN NYSPE TO EVAL THE ENTIRE BLDG, PREPARE/FILE REPAIR DWGS, REPAIR BLDG UNDER BLDG, START OWRK BY 11/30/2026

  • Construction

    Issued Aug 4, 2020 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION, DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO STOREFRONT DUE TO ADJACENT BUILDING ( 100 EAST 12 STREET MN ) WALL COLLAPSED AT 113 EAST 12 STREET MANHATTAN.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01397321-S2.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01397321-S2
BBL
1005580047
Review type
Professional Certification
Existing stories
5
Proposed stories
Empty in the source
Existing dwelling units
4
Proposed dwelling units
Empty in the source
Sidewalk shed