What the filing says
A public-record reading of the proposed work.
Garage repair work on roof
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1940, with 88 homes, on a 42,700 sq ft lot.
- Built
- 1940
- Floors
- 6
- Residential units
- 88
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R4
- Lot area
- 42,700 sq ft
- Building area
- 104,465 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 6, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 7 notices on file; the most recent was issued Jan 20, 2026.
- Construction
Issued Jan 20, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN DOB VIOLATION #092225CE30501NB CN359016)ISSUED ON 9/22/25. REMEDY: COMPLY W/CODE W/ALL REQUIREMENTS OF COMMISSIONER'S ORDER. RETAIN NYS PE TO PERFORM STRUCTURAL STABILITY.AFTER HAZARD INCREASING EVENTS, SUBMIT WEEKLY REPORT TO MNBROWNLIE@BUILDINGS.NYC.GOV
- Construction
Issued Jan 20, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN DOB VIOLATION #092235CE30502NB CN 359017 ISSUED ON 9/22/25. TEMPORARY STABILIZATION & DEMO WORK WAS TO COMMENCE BY 11/3/25. HOWEVER THIS DEADLINE WAS NOT MET. REMEDY:COMPLY W/CODE WITH REQUIREMENTS OF AFOREMENTIONED COMMISSI ORDER BY 2/27/26.SUBMIT DOCS & CORR TO YONUH@BUILDINGS.NYC.GOV
- Construction
Issued Sep 22, 2025 — FAILURE TO MAINTAIN-PARTIAL COLLAPSE OF EXP#4 PARAPET DURING UNPERMITD WRK ON 9/9/25. SALAMON ENG RPTS DATED 9/15 & 9/16 RECOMMENDS REMOVAL OF ALL BRICK & FENCING ALONG PARAPET WALLS. REMEDY: RETAIN NYS PE & GC TO TEMP STABILIZE & PART DEMO BLDG TO SAFEGUARD SITE, ADJ PROP, & PUBLIC. COMMENCE UNDER PERMIT BY 11/3/25
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01416212-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01416212-I1
- BIN
- 3401466
- BBL
- 3038860010
- Postal code
- 11207 · 3429 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 88
- Proposed dwelling units
- 88