What the filing says
A public-record reading of the proposed work.
Subsequent filing for PL work to facilitate the renovation work filed separately. work includes direct replacement of all plumbing fixtures. no changes in use, egress and occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story mainly residential with some commercial built in 1931, with 3 homes, on a 2,303 sq ft lot.
- Built
- 1931
- Floors
- 2
- Residential units
- 3
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R5D
- Lot area
- 2,303 sq ft
- Building area
- 2,520 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 5 notices on file; the most recent was issued Nov 12, 2025.
- Construction
Issued Nov 12, 2025 — FAILURE TO MAINTAIN.AT TIME OF INSPECTN,OBSRVD BLDG DMGD DUE TO FIRE WHICH ORIGINATD@NEIGHBORNG 114-46 SUTPHIN BLVD,W/MINOR CHARRNG OF WOOD JOISTS,WNDWSKYLGHT OUT,CHARRNG@LIGHTWLL WALLS,SMOKE WATER/FRE COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #081125FEU41202AK (CONTROL #341594) IMMEDIATELY
- Construction
Issued Aug 14, 2025 — FAILURE TO MAINTAIN.AT TIME OF INSPCTN,OBSRVD BLDG DMG DUE TO FIRE WHICH ORIGNATD@NEIGHBORNG 114-46 SUTPHIN BLVD,W/MINOR CHARRNG OF WOOD JOISTS,WNDWS SKYLGHT OUT,CHARRNG@LGHTWLL WALLS,SMOKE WATER.FIRE.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #081125FEU41201AK (CONTROL # 341593) IMMEDIATELY
- Construction
Issued Aug 11, 2025 — FAILURE TO MAINTAIN.AT TIME OF INSPCTN,OBSRVD BLDG DMGD DUE TO FIRE WHICH ORIGINTD@NEIGHBORNG 114-46 SUTPHIN BLVD,W/MINOR CHARRNG OF WOOD JOISRS,WNDWS SKYLGHT OUT,CHARRNG@LGHTWLL WALLS,SMOKE WATER/FRE.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #081125FEU41201AK (CONTROL # 341593) IMMEDIATELY
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01319074-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01319074-S2
- BBL
- 4119800024
- Postal code
- 11434 · 102 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 3
- Proposed dwelling units
- 3








