NYC DOB record · M01016327-S1

114 East 1 Street

114 East 1 Street, Manhattan, NY 10009

Alteration filing in East Village, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01016327-S1

114 East 1 Street

Manhattan, NY 10009

Alteration filing · status dated Sep 8, 2026

Current record
Recorded as completed
Proposed scale
6 stories
Dwelling units
30
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01016327-S1 as a alteration filing at 114 East 1 Street, Manhattan, NY 10009. Its latest published status category is Recorded as completed, dated Sep 8, 2026. The filing records 6 proposed stories and 30 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 8, 2026
Proposed scale
6 proposed stories and 30 proposed dwelling units
Applicant of recordSee the 9 filings that name Archaq
FiledApr 15, 2024
Current recordRecorded as completed
Proposed scale6 stories
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Proposed plumbing fixtures to apartment # 5

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story walk-up apartment building built in 1920, with 30 homes, on a 3,970 sq ft lot.

Built
1920
Last altered
1988
Floors
6
Residential units
30
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
R8A
Lot area
3,970 sq ft
Building area
17,610 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 26 notices on file; the most recent was issued Jan 6, 2026.

  • Construction

    Issued Jan 6, 2026 — PARTIAL VACATE ORDER. OBSERVED SUBSTANTIALLY LEANING PARAPET WALL @ EXPOSURE 2/WEST ELEVATION. ALSO MULTIPLE SMEAR CRACKS THROUGHOUT EXTERIOR WALL SYSTEM, AND VERTICAL CRACK RUNNING THE HEIGHT OF THE EXTERIAL WALL AADJACENT TO NEIGHBORING PROPERTY. REMEDY: VACATE ENTIRE ROOF AND EXPOSURE 2, WEST ELEVATIN, EXCEPT IN EMERGENCY PURPOSES

  • Construction

    Issued Jan 6, 2026 — PARTIAL VACATE ORDER. OBSERVED SUBSTANTIAL LEANING PARAPET WALL @ EXP 2 W ELEV. ALSO SMEAR CRACKS THROUGHOUT EXTERIAL WALL SYSTEM, AND A VERTICAL CRACK RUNNING THE HEIGHT OF EXTERIAL WALL ADJACENT TO THE NEIGHBORING PROPER EXP2,W ELEV. REMEDY: VACATE THE ENTIRE ROOF AND EXPOSURE 2, WEST ELEVATION, EXCEPT IN EMERGENCY PURPOSES

  • Construction

    Issued Dec 31, 2025 — FAILURE TO MAINTAIN FACADE & APPURTANCES. OBSERVED SUBSTANTIAL LEANING PARAPET WALL EXP2, W ELE, MULT SMEAR CRACK THROUGHOUT EXTERIOR WALL SYS VERTICAL CRACK RUN THE HEIGHT OF EXTERIOR WALL ADJACENT TO NEIGHBO PROP. REMEDY:OWNER TO IMMED RETAIN NYC RDP TO INSPECT,EVALUATE 100% OF PARAPET WALL ENTIRE WALL SYS. REPORT TO FACADES@BUILDINGS.NYC.GOV

  • 1 further open notice is on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01016327-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01016327-S1
BIN
1005754
BBL
1004290045
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
30
Proposed dwelling units
30