NYC DOB record · X01441877-I1

1141 Elder Avenue

1141 Elder Avenue, Bronx, NY 10472

Alteration filing in Soundview-Bruckner-Bronx River, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01441877-I1

1141 Elder Avenue

Bronx, NY 10472

Alteration filing · status dated Oct 8, 2026

Current record
Approved
Proposed scale
5 stories
Dwelling units
48
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01441877-I1 as a alteration filing at 1141 Elder Avenue, Bronx, NY 10472. Its latest published status category is Approved, dated Oct 8, 2026. The filing records 5 proposed stories and 48 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 8, 2026
Proposed scale
5 proposed stories and 48 proposed dwelling units
Applicant of recordSee the 178 filings that name Asr Engineering PC
FiledSep 28, 2026
Current recordApproved
Proposed scale5 stories
Recorded cost$9,000

What the filing says

A public-record reading of the proposed work.

Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the NYC code 2022. no change in use, occupancy or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1928, with 48 homes, on a 10,000 sq ft lot.

Built
1928
Floors
5
Residential units
48
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
10,000 sq ft
Building area
36,500 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 21 notices on file; the most recent was issued Sep 17, 2026.

  • Construction

    Issued Sep 17, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#370520 VIO#071626PI20902HZ DATED 07/16/2026 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 08/07/2026. AS OF 09/17/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#370520 VIO#071626PI20902HZ

  • Construction

    Issued Jul 16, 2026 — CORRECTIVE ACTION PLAN REQ'D-LARGE PORTIONS OF MISSING STUCCO,PARTLY DETACHED,CRACKED & BULGING FROM BRICK MASONRY,VERT STEP CRACKS TO BRICKS & MORATR,MISSING BRICKS @ CORNER EDGES. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING WITH DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN

  • Failure to post energy

    Issued Apr 29, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01441877-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01441877-I1
BIN
2023837
BBL
2037390059
Review type
Standard Plan Examination
Existing stories
5
Proposed stories
5
Existing dwelling units
48
Proposed dwelling units
48
Sidewalk shed