NYC DOB record · B00098948-I1

1146 49 Street

1146 49 Street, Brooklyn, NY 11219

Alteration filing in Borough Park, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00098948-I1

1146 49 Street

Brooklyn, NY 11219

Alteration filing · status dated Aug 13, 2021

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00098948-I1 as a alteration filing at 1146 49 Street, Brooklyn, NY 11219. Its latest published status category is Recorded as completed, dated Aug 13, 2021. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 13, 2021
Proposed scale
Not stated in this filing
Complete building dossierView all 2 filings associated with BIN 3137663Applicant of recordSee the 701 filings that name Haider Engineering, P.E.
FiledNov 14, 2018
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of temporary pipe scaffold for new building as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story two-family home built in 1905, on a 2,003 sq ft lot.

Built
1905
Last altered
2018
Floors
4
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R6
Lot area
2,003 sq ft
Building area
4,393 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00098948-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00098948-I1
BBL
3056400025
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source