What the filing says
A public-record reading of the proposed work.
Installation of temporary sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story mainly residential with some commercial built in 1910, on a 1,700 sq ft lot.
- Built
- 1910
- Last altered
- 2018
- Floors
- 4
- Residential units
- 2
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 1,700 sq ft
- Building area
- 5,190 sq ft
- Historic district
- Brooklyn Heights Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
No open violations are recorded for this building. 23 notices are on file, all with a recorded resolution.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00421001-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00421001-I1
- BIN
- 3002708
- BBL
- 3002740003
- Postal code
- 11201 · 3965 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2