NYC DOB record · M01305291-I1

115 East 87 Street

115 East 87 Street, Manhattan, NY 10128

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01305291-I1

115 East 87 Street

Manhattan, NY 10128

Alteration filing · status dated Sep 24, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
198
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01305291-I1 as a alteration filing at 115 East 87 Street, Manhattan, NY 10128. Its latest published status category is Approved, dated Sep 24, 2026. The filing records 198 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 24, 2026
Proposed scale
198 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1048043Applicant of recordSee the 259 filings that name Rigid Structural Design, LLC
FiledDec 4, 2025
Current recordApproved
Proposed scale198 units
Recorded cost$2,500

What the filing says

A public-record reading of the proposed work.

Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 38-story condominium built in 1972, with 198 homes, on a 30,883 sq ft lot.

Built
1972
Last altered
1988
Floors
38
Residential units
198
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R10
Lot area
30,883 sq ft
Building area
436,090 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 9 open notices on record for this building, out of 99 notices on file; the most recent was issued Dec 9, 2025.

  • Construction

    Issued Dec 9, 2025 — BUILDING HAS BEEN OBSERVED HAVING SPECIAL INSPECTOR JAY KAVI (P.E) REMOVED FROM APPLICATION M01050180-I1 DUE TO SURRENDERING OF FILING PRIVILEGES. NEW SPECIAL INSPECTOR MUST SUPERSEDE PREVIOUS INSPECTOR TO PREVENT REVOCATION OF THE PERMIT FOR THIS JOB.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Plumbing

    Issued Jul 8, 2024 — THE DEPARTMENT OF BUILDINGS INTENDS TO REVOKE THE PERMIT AND APPROVALS ISSUED IN CONNECTION TO JOB# M00731591 DUE TO SUSPENSION OF THE MASTER PLUMBER'S LICENSE# 2286. ALL PLUMBING WORK IN CONNECTION WITH THIS APPLICATION HAS BEEN ORDERED TO BE STOPPED IMMEDIATELY

  • 6 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01305291-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01305291-I1
BBL
1015167502
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
198
Proposed dwelling units
198
Scaffolding