NYC DOB record · M01332776-S1

115 West 125 Street

115 West 125 Street, Manhattan, NY 10027

Alteration filing in Harlem (South), Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01332776-S1

115 West 125 Street

Manhattan, NY 10027

Alteration filing · status dated Nov 23, 2026

Current record
Recorded as completed
Proposed scale
10 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01332776-S1 as a alteration filing at 115 West 125 Street, Manhattan, NY 10027. Its latest published status category is Recorded as completed, dated Nov 23, 2026. The filing records 10 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 23, 2026
Proposed scale
10 proposed stories
The building, not the filingopen housing violations and every filing at BIN 1085673Applicant of recordSee the 136 filings that name Hny Consulting Engineers LLC
FiledJan 17, 2026
Current recordRecorded as completed
Proposed scale10 stories
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

Plumbing subsequent application of the 1st floor for retail build out. No change in use, egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 10-story condominium built in 2001, on a 41,435 sq ft lot.

Built
2001
Floors
10
Residential units
0
Building type
Condominium
Land use
Commercial and office
Zoning district
C4-7
Lot area
41,435 sq ft
Building area
284,579 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 25, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01332776-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 101,127 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01332776-S1
BBL
1019107501
Review type
Professional Certification
Existing stories
10
Proposed stories
10
Existing dwelling units
0
Proposed dwelling units
0