What the filing says
A public-record reading of the proposed work.
Existing two (2) stories two (2) family dwelling units to be horizontally enlarged and fully renovated. New drywall partitions and plumbing fixtures as per plans. No change in use ,egress or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1.67-story two-family home built in 1945, on a 3,363 sq ft lot.
- Built
- 1945
- Floors
- 1.67
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R3A
- Lot area
- 3,363 sq ft
- Building area
- 1,434 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 5 notices on file; the most recent was issued Apr 2, 2025.
- Unsafe
Issued Apr 2, 2025
- Construction
Issued Mar 4, 2025 — FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.DUE TO FIRE ON 3/2/25,EXP 3 WALL FIRE DMGD&PRTLLY OPEN&EXPOSD @1ST &2NDFL ATTIC&ROOF JOIST FIRE DMGD THROUGHOUT.REAR STEEL/ALUMINUM.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS W/DOB PERM RPAIR BLDG UNDR PRMT STRTNG BY 4/4/25 CMPLT BY 6/6/25
- Construction
Issued Mar 2, 2025 — STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE AT 116-52 146 STREET QUEENS.
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01362593-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01362593-I1
- BBL
- 4120050030
- Postal code
- 11436 · 60 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








