NYC DOB record · B00508243-I1

116 Lake Street

116 Lake Street, Brooklyn, NY 11223

Alteration filing in Gravesend (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00508243-I1

116 Lake Street

Brooklyn, NY 11223

Alteration filing · status dated Nov 14, 2025

Current record
Recorded as completed
Proposed scale
2 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00508243-I1 as a alteration filing at 116 Lake Street, Brooklyn, NY 11223. Its latest published status category is Recorded as completed, dated Nov 14, 2025. The filing records 2 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 14, 2025
Proposed scale
2 proposed stories and 3 proposed dwelling units
The building, not the filingthe owner of record and every filing at BIN 3190394Applicant of recordSee the 38 filings that name Jian Engineering PLLC
FiledApr 28, 2021
Current recordRecorded as completed
Proposed scale2 stories
Recorded cost$82,500

What the filing says

A public-record reading of the proposed work.

File this application to remove existing brick veneer and install new one for existing residential building,facade work only.no change to use,egress and c of o.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story walk-up apartment building built in 1930, with 3 homes, on a 2,435 sq ft lot.

Built
1930
Last altered
2023
Floors
2
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R5B
Lot area
2,435 sq ft
Building area
2,400 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Aug 20, 2022.

  • Construction

    Issued Aug 20, 2022 — DUE TO THE APPLICANT OF RECORD ALBERTO ROMAN PE 95364 HAS SURRENDERED ALL FILING PRIVILEGES, THEREFORE PURSUANT TO AC 28-105.10.2 THE BOROUGH COMMISSIONERS OFFICE HAS ORDERED A SWO ON JOB APPLICATION B00508243

  • Construction

    Issued Aug 20, 2022 — DUE TO THE APPLICANT OF RECORD ALBERTO ROMAN PE 95364 HAS SURRENDERED ALL FILING PRIVILEGES, THEREFORE PURSUANT TO AC 28-105.10.2 THE BOROUGH COMMISSIONERS OFFICE HAS ORDERED A SWO UNDER JOB APPLICATION B00508243

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00508243-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00508243-I1
BBL
3070860014
Review type
Standard Plan Examination
Existing stories
2
Proposed stories
2
Existing dwelling units
3
Proposed dwelling units
3
General construction