NYC DOB record · M01023439-I1

116 Nassau Street

116 Nassau Street, Manhattan, NY 10038

Alteration filing in Financial District-Battery Park City, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01023439-I1

116 Nassau Street

Manhattan, NY 10038

Alteration filing · status dated Sep 18, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
10
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01023439-I1 as a alteration filing at 116 Nassau Street, Manhattan, NY 10038. Its latest published status category is Approved, dated Sep 18, 2026. The filing records 10 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 18, 2026
Proposed scale
10 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1079094Applicant of recordSee the 107 filings that name Asr Engineering PC
FiledMar 21, 2024
Current recordApproved
Proposed scale10 units
Recorded cost$9,000

What the filing says

A public-record reading of the proposed work.

Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the NYC code 2022. no change in use, occupancy or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story office building built in 1910, on a 12,173 sq ft lot.

Built
1910
Last altered
1989
Floors
12
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-5
Lot area
12,173 sq ft
Building area
109,173 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 16 open notices on record for this building, out of 131 notices on file; the most recent was issued Feb 22, 2024.

  • No report and / or late filing (facade)

    Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024

  • Hazardous condition (facade)

    Issued Feb 21, 2024 — CYCLE 9C UNSAFE REPORT FILED

  • Failure to post energy

    Issued Dec 1, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 13 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01023439-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01023439-I1
BBL
1000920024
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
10
Proposed dwelling units
10
Sidewalk shedScaffolding