What the filing says
A public-record reading of the proposed work.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story mainly residential with some commercial built in 1930, with 3 homes, on a 2,000 sq ft lot.
- Built
- 1930
- Floors
- 4
- Residential units
- 3
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R7D
- Lot area
- 2,000 sq ft
- Building area
- 4,800 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 12 notices on file; the most recent was issued Aug 12, 2026.
- Construction
Issued Aug 12, 2026 — FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.THE BLDG SUFFERED FIRE DMG ON/ARND 5/16/25.FRNT OF THE ROOF PRTLLY CLPSD INTO 4THFL DMGNG THE 4TH FL FRAMNG&LEAVNG THE 4THFL EXP1 WALL UNBRACED.ROOF JOISTS.1.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&FILE RPAIR DWGS W/DOB,2.BLDG TO BE PERM RPAIRD UNDR PERMT STRTNG BY 9/28/26
- Construction
Issued Aug 12, 2026 — EMERGENCY WORK ORDR.THE BLDG SFFRD FIRE DMG ON/ARND 5/16/26 FRNT OF THE ROOF PRTLLY CLLPSD INTO 4THFL DAMAGNG THE 4THFL FRAMNG&LEAVNG THE 4THFL EXP1 WALL UNBRACD,ROOF JOISTS WERE MOD TO SEV FIRE DM.OWNR TO RTAIN NYSPE,DEMO ENDRSD GC&ASBESTOS GC TO IMMED 1.PE TO SBMT METHDS BY 8/14/26 TO FEU&DEP FOR REVIEW,2.UPON APPRVL
- Construction
Issued May 16, 2026 — RESPONDING TO AN INCIDENT OBSERVED A 4-STORY MULTIPLE DWELLING BUILDING SUSTAINED FIRE DAMAGE CONSISTING OF CHARRED WOOD JOINTS, OPEN FIRE RATED WALLS, MISSING WINDOWS, SMOKE AND WATER DAMAGE THROUGHOUT. THE PARAPET IS DAMAGED AT EXP#1AND ROOF IS OPEN LEAVING BUILDING EXPOSED TO ALL ELEMENTS
7 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01454128-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01454128-I1
- BIN
- 3057757
- BBL
- 3020170029
- Postal code
- 11216 · 1872 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








