NYC DOB record · S01049822-I1

117 Winham Avenue

117 Winham Avenue, Staten Island, NY 10306

Alteration filing in New Dorp-Midland Beach, Staten Island. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01049822-I1

117 Winham Avenue

Staten Island, NY 10306

Alteration filing · status dated Sep 24, 2026

Current record
Recorded as completed
Proposed scale
3 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01049822-I1 as a alteration filing at 117 Winham Avenue, Staten Island, NY 10306. Its latest published status category is Recorded as completed, dated Sep 24, 2026. The filing records 3 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 24, 2026
Proposed scale
3 proposed stories and 2 proposed dwelling units
The building, not the filingEvery filing at BIN 5170435, with the parcel and violation recordApplicant of recordSee the 53 filings that name 1+1 Design Studio LLC
FiledMay 15, 2024
Current recordRecorded as completed
Proposed scale3 stories
Recorded cost$6,000

What the filing says

A public-record reading of the proposed work.

Interior renovation to remove framing wall,to reinstall roll down gate and to restore to be two car garage on 1st fl.to remedy ecb violation#39112945z,pluming work will be filed by separate application,no change in means of use,egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story two-family home built in 2020, on a 2,525 sq ft lot.

Built
2020
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R3-1
Lot area
2,525 sq ft
Building area
2,223 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 4, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01049822-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,295 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01049822-I1
BBL
5040470051
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
2
Proposed dwelling units
2
General construction