NYC DOB record · M00952896-I1

1175 3 Avenue

1175 3 Avenue, Manhattan, NY 10065

Alteration filing in Upper East Side-Lenox Hill-Roosevelt Island, Manhattan. The latest DOB status is on hold - pending supersede of progress inspector.

The filing is paused until an administrative step is completed. It has not been rejected. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00952896-I1

1175 3 Avenue

Manhattan, NY 10065

Alteration filing · status dated Sep 18, 2026

Current record
Under review
Proposed scale
54 stories
Dwelling units
283
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00952896-I1 as a alteration filing at 1175 3 Avenue, Manhattan, NY 10065. Its latest published status category is Under review, dated Sep 18, 2026. The filing records 54 proposed stories and 283 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 18, 2026
Proposed scale
54 proposed stories and 283 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1043902Applicant of recordSee the 5 filings that name Frederick Taylor Assoc - Arch, PC
FiledNov 17, 2023
Current recordUnder review
Proposed scale54 stories
Recorded cost$80,000

What the filing says

A public-record reading of the proposed work.

8758 B - Build out of existing Use Group 6 space, installation of non bearing partitions finishes, fixtures, Temporary lights, flooring finishes etc. to create new tenant area. No change in egress use group or occupancy. Pro Cert Requested.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 57-story condominium built in 1950, with 275 homes, on a 42,175 sq ft lot.

Built
1950
Floors
57
Residential units
275
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R8B
Lot area
42,175 sq ft
Building area
366,603 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 11 open notices on record for this building, out of 200 notices on file; the most recent was issued Apr 21, 2026.

  • Construction

    Issued Apr 21, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED AT THE TIME OF INSPECTION I OBSERVED SPALLED SLAB CORNER ON EXPOSURE 1 FLAKING PAINT ON SLAB AT EXPOSURE 1 AN EXPOSURE 4. OPEN REINFORCEMENT ON BULKHEAD AT ROOF AREA. REMEDY: REPAIR AND/OR REPLACE

  • Hazardous condition (facade)

    Issued Nov 1, 2023 — CYCLE 9C UNSAFE REPORT FILED

  • Elevator

    Issued Aug 16, 2019

  • 8 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00952896-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “On Hold - Pending Supersede of Progress Inspector.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00952896-I1
BBL
1014237501
Review type
Professional Certification
Existing stories
54
Proposed stories
54
Existing dwelling units
283
Proposed dwelling units
283
General construction