NYC DOB record · X01434441-P1

1175 Fulton Avenue

1175 Fulton Avenue, Bronx, NY 10456

Alteration filing in Claremont Village-Claremont (East), Bronx. The latest DOB status is prof cert qa review.

The filing was professionally certified by its architect or engineer, and DOB is auditing it rather than reviewing it in full. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01434441-P1

1175 Fulton Avenue

Bronx, NY 10456

Alteration filing · status dated Nov 9, 2026

Current record
Under review
Proposed scale
Not stated
Dwelling units
43
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01434441-P1 as a alteration filing at 1175 Fulton Avenue, Bronx, NY 10456. Its latest published status category is Under review, dated Nov 9, 2026. The filing records 43 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Nov 9, 2026
Proposed scale
43 proposed dwelling units
Applicant of recordSee the 655 filings that name Mchenery Testing Lab
FiledNov 6, 2026
Current recordUnder review
Proposed scale43 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1925, with 43 homes, on a 9,261 sq ft lot.

Built
1925
Last altered
1967
Floors
5
Residential units
43
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
9,261 sq ft
Building area
28,800 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 14 notices on file; the most recent was issued Jun 29, 2026.

  • Construction

    Issued Jun 29, 2026 — EMERGENCY WORK ORDER.A SECTION OF BRCK MASNRU@EXP1 WAS DISLODGED BETWEEN 5TH&6THFL LVLS OF C LINE APT,&THE FALLEN DEBRIS FROM THAT MASONRY SECTION DMGD THE SDWLK SHED.LINTEL OF APT4C WNDW ON 6THFL.OWNR TO RTAIN NYSPE&GC REG W/DOB TO IMMED 1.NYSPE TO SUBMIT MEANS&METHDS TO TEMP STBLZE THE DISLODGD FACADE&REMVE LOOSE

  • Construction

    Issued Jun 29, 2026 — FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.CRCKS WERE OBSVD ON PARAPET WALL@ALL EXPOSURES.AN ANNUAL PARAPET OBSERVATION IS REQUIRED TO BE COMPLETED ANNUALLY STARTING IN 2024.SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 TO BE RECEIVED BY DOB NO LATER THAN 07/13/26

  • Construction

    Issued Jun 29, 2026 — FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.AT EXP1 FACADE,SECTIONS OF BRCK MASONRY WERE LOOSE,DISLODGED,&CRCKD.PARAPET WALLS@ALL EXPS HAD CRCKS.CRCKS&SAGGNG CEILNGS WERE OBSVD IN APTS A,B,C,&D LINES.1.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&FILE RPAIR DWGS W/DOB,2.BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 8/10/26

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01434441-P1.

    01
  2. Current status updated

    The latest recorded filing status is “Prof Cert QA Review.”

    02

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01434441-P1
BIN
2004218
BBL
2026090046
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
43
Proposed dwelling units
43
Scaffolding