NYC DOB record · M01081582-S2

1175 Park Avenue

1175 Park Avenue, Manhattan, NY 10128

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01081582-S2

1175 Park Avenue

Manhattan, NY 10128

Alteration filing · status dated Aug 20, 2026

Current record
Recorded as completed
Proposed scale
150 stories
Dwelling units
52
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01081582-S2 as a alteration filing at 1175 Park Avenue, Manhattan, NY 10128. Its latest published status category is Recorded as completed, dated Aug 20, 2026. The filing records 150 proposed stories and 52 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 20, 2026
Proposed scale
150 proposed stories and 52 proposed dwelling units
FiledJan 16, 2025
Current recordRecorded as completed
Proposed scale150 stories
Recorded cost$22,500

What the filing says

A public-record reading of the proposed work.

Installation of new mechanical equipment in apt. #10A1. Work to include condenser and related ductwork, PTAC units & new toilet and range exhausts as per plans filed herewith.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 14-story elevator apartment building built in 1925, with 45 homes, on a 15,251 sq ft lot.

Built
1925
Floors
14
Residential units
45
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
15,251 sq ft
Building area
174,910 sq ft
Historic district
Expanded Carnegie Hill Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 3, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 37 notices on file; the most recent was issued Nov 14, 2016.

  • (other bldgs types) - elevator affirmation of

    Issued Nov 14, 2016 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST

  • (other bldgs types) - elevator affirmation of

    Issued Nov 14, 2016 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST

  • (other bldgs types) - elevator affirmation of

    Issued Nov 14, 2016 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST

  • 2 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01081582-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01081582-S2
BIN
1048372
BBL
1015210069
Review type
Standard Plan Examination
Existing stories
150
Proposed stories
150
Existing dwelling units
52
Proposed dwelling units
52