What the filing says
A public-record reading of the proposed work.
Temporary chainlink construction fence with windscreen
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a vacant land on a 41,950 sq ft lot.
- Residential units
- 0
- Building type
- Vacant land
- Land use
- Vacant land
- Zoning district
- C4-2
- Lot area
- 41,950 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 5 notices on file; the most recent was issued Dec 26, 2025.
- Immediate
Issued Dec 26, 2025 — DISPOSE/REMOVE EXISTING CONSTRUCTION, WOOD PANEL UNSECURED AND DETERIRATED, PEELING/WARPED. VACANT TO EXPOSURES 1,3, & 4 FOR APPROX TOTAL LINEAR FT 654 OF FENCE. EXPOSURE 1 (CENTRAL AVENUE) 213 LINEAR FT. EXPOSURE 3 (ST. MARKS PLACE) 226 LINEAR FT. EXPOSURE 4 (ADJACENT TO PROPERTY 100 CENTRAL AVE) 215 LINEAR FT
- Construction
Issued Feb 4, 2010
- Construction
Issued Feb 4, 2010
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application approved01
The application reached an approved status in the DOB record.
- Current status updated02
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S01342837-P1
- BIN
- 5177268
- BBL
- 5000060003
- Postal code
- 10301 · 132 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0