NYC DOB record · M01145530-I1

118 West 114 Street

118 West 114 Street, Manhattan, NY 10026

Alteration filing in Harlem (South), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01145530-I1

118 West 114 Street

Manhattan, NY 10026

Alteration filing · status dated Sep 22, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
10
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01145530-I1 as a alteration filing at 118 West 114 Street, Manhattan, NY 10026. Its latest published status category is Approved, dated Sep 22, 2026. The filing records 6 proposed stories and 10 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 22, 2026
Proposed scale
6 proposed stories and 10 proposed dwelling units
Applicant of recordSee the 38 filings that name Engineering Group Associates PC
FiledNov 27, 2024
Current recordApproved
Proposed scale6 stories
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Remove and rebuild the building chimney. there is no change occupancy, use or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1900, with 10 homes, on a 2,624 sq ft lot.

Built
1900
Floors
5
Residential units
10
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7-2
Lot area
2,624 sq ft
Building area
9,965 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01145530-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01145530-I1
BIN
1055028
BBL
1018230045
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
10
Proposed dwelling units
10
General constructionStructural work