What the filing says
A public-record reading of the proposed work.
Install reinforced concrete vault roof in area underneath existing sidewalk as per plans filed herewith. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story store building built in 1905, on a 16,000 sq ft lot.
- Built
- 1905
- Last altered
- 2009
- Floors
- 3
- Residential units
- 0
- Building type
- Store building
- Land use
- Mixed residential and commercial
- Zoning district
- R7X
- Lot area
- 16,000 sq ft
- Building area
- 44,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 12 open notices on record for this building, out of 31 notices on file; the most recent was issued Jun 8, 2022.
- Construction
Issued Jun 8, 2022 — FAILURE TO COMPLY WITH DOB VIO#052318FEU30302BS(CONTROL#334021)ISSUED ON MAY 23, 2018, VIOLATION REQUIRED REPAIRS UNDER PERMIT W/PERMIT TO .BE OBTAINED BY 06/29/2018 AND PERMIT SIGNED OFF BY 08/31/2018. NO PERMIT ON FILE FOR REPAIRS TO 1180 PORTION OF BUILDING AS OF JUNE 8, 2022. REMEDY: COMPLY W/DOB #052318FEU30302BS IMMED
- Construction
Issued Jun 8, 2022 — FAILURE TO COMPLY WITH DOB VIOLATION#052318FEU30302BS (CONTROL#334021) ISSUED ON 5/23/2018.VIOLATION REQUIRED REPAIRS UNDER PERMIT W/PRMIT TO BE OBTAINED BY 6/29/2018 & PERMIT SIGNED OFF BY 8/31/2018.NO PERMIT ON FILE FOR REPAIRS TO 1180 PORTION OF BLDG AS OF 6/8/22 COMPLY WITH DOB VIOLATION #052318FEU30302BS IMMEDIATELY
- Elevator
Issued Sep 25, 2019
9 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01402392-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 80,574 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01402392-I1
- BBL
- 3019900030
- Postal code
- 11216 · 2455 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 0
- Proposed dwelling units
- 0