What the filing says
A public-record reading of the proposed work.
Renovate Apt. 16G on floors 15+PH : general construction to include new partitions, flooring, lighting, millwork, stair railing, trim and moldings, plumbing filed as S1 ,(total sf apt. sf is 5100 sf., areas of work is 4000 sf)
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 15-story elevator apartment building built in 1929, with 172 homes, on a 50,857 sq ft lot.
- Built
- 1929
- Last altered
- 2020
- Floors
- 15
- Residential units
- 172
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8B
- Lot area
- 50,857 sq ft
- Building area
- 550,905 sq ft
- Historic district
- Expanded Carnegie Hill Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 187 notices on file; the most recent was issued Aug 26, 1996.
- Construction
Issued Aug 26, 1996
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01198378-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01198378-I1
- BBL
- 1015220001
- Postal code
- 10128 · 695 filings
- Review type
- Standard Plan Examination
- Existing stories
- 15
- Proposed stories
- 15
- Existing dwelling units
- 172
- Proposed dwelling units
- 172