What the filing says
A public-record reading of the proposed work.
Combination of two residential units including demolition and reconfiguration as per TPPN 3/97.. Removal of one kitchen and addition of one powder room. Installation of new fixtures and finishes. Filed to supersede Alt M01340858 which (see comments)
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 18-story elevator apartment building built in 1961, with 148 homes, on a 17,616 sq ft lot.
- Built
- 1961
- Last altered
- 1983
- Floors
- 18
- Residential units
- 148
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10
- Lot area
- 17,616 sq ft
- Building area
- 210,988 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 37 notices on file; the most recent was issued Apr 30, 2019.
- No report and / or late filing (facade)
Issued Apr 30, 2019 — FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
- Construction
Issued Jun 22, 1989
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01379396-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01379396-S1
- BIN
- 1048412
- BBL
- 1015230001
- Postal code
- 10128 · 192 filings
- Review type
- Standard Plan Examination
- Existing stories
- 18
- Proposed stories
- 18
- Existing dwelling units
- 146
- Proposed dwelling units
- 146








