NYC DOB record · B01440390-I1

12 Kossuth Place

12 Kossuth Place, Brooklyn, NY 11221

Full demolition filing in Bushwick (East), Brooklyn. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewFull demolition

NYC Department of Buildings · w9ak-ipjd · accessed Oct 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01440390-I1

12 Kossuth Place

Brooklyn, NY 11221

Full demolition · status dated Sep 30, 2026

Current record
Under review
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01440390-I1 as a full demolition at 12 Kossuth Place, Brooklyn, NY 11221. Its latest published status category is Under review, dated Sep 30, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Full demolition
Latest status
Under review
Latest status date
Sep 30, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 118 filings that name Adroit Engineering PLLC
FiledSep 3, 2026
Current recordUnder review
Proposed scaleNot specified
Recorded cost$85,000

What the filing says

A public-record reading of the proposed work.

Full demolition of an existing three-story attached masonry building with cellar under an Immediate Emergency Declaration. #20451. Perform controlled top-down manual demolition using hand tools and manlifts, with temporary shoring, wall bracing, tie-back

Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story walk-up apartment building built in 1915, with 3 homes, on a 2,000 sq ft lot.

Built
1915
Floors
2
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
2,000 sq ft
Building area
2,100 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 4 notices on file; the most recent was issued Sep 22, 2026.

  • Construction

    Issued Sep 22, 2026 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B01236237-I1 ON 9/3/26 DUE TO CONSTRUCTION SUPERINTENDENT WITHDRAWAL

  • Construction

    Issued Jul 16, 2026 — FAILURE TO MAINTAIN BLDG N A SAFE CONDITION.REAR HALF OF 1ST & 2NDFLRS PRTLLY CLLPSD.&EXP3(REAR)WALL INADEQUATELY BRACED EXP4PRTY WLL WAS INADEQUATELY BRACED&HAD VARIOUS JOISTS OCKTS OPEN&ISOLTD.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG INCLDNG PRTY WALL&RPAIR UNDR PRMT.STRT WRK BY 9/7/26&CMPLT/SGN OFF BY 10/19/26

  • Construction

    Issued Jul 16, 2026 — EMERGENCY WORK: URM/WOOD COMPRMSD BLDG IN DEMO;COLLAPSE.RISK.JOISTS MISSING,COLLAPSED, UNACHORED.EXPO 3 & PART EXPO 2/4WALLS UNBRACED EXPO 3 SHIFTED. DAMAGE TO ADJ PROP (10 KOSSUTH PL).REMEDY:HIRE PE/CS/ GC FOR EMERGENCY WORK.PLANS DUE BY 12PM 7/17/26,WORK START BY 9AM 7/20/26.SUBMIT DAILY S&S PE REPORTS.FILE APP

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01440390-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01440390-I1
BIN
3074315
BBL
3032630014
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
Empty in the source
Existing dwelling units
3
Proposed dwelling units
Empty in the source