What the filing says
A public-record reading of the proposed work.
Plumbing work for the renovations of apt 19a as per plans.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 29-story elevator apartment building built in 1927, with 152 homes, on a 10,217 sq ft lot.
- Built
- 1927
- Last altered
- 1971
- Floors
- 29
- Residential units
- 152
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10A
- Lot area
- 10,217 sq ft
- Building area
- 192,543 sq ft
- Historic district
- Upper West Side / Central Park West Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 74 notices on file; the most recent was issued Apr 26, 2019.
- Elevator
Issued Apr 26, 2019
- Elevator annual inspection /
Issued Apr 5, 2019 — VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
- Elevator annual inspection /
Issued Sep 15, 2017 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 1, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01346967-S1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01346967-S1
- BBL
- 1011240042
- Postal code
- 10023 · 559 filings
- Review type
- Standard Plan Examination
- Existing stories
- 29
- Proposed stories
- 29
- Existing dwelling units
- 175
- Proposed dwelling units
- 175