What the filing says
A public-record reading of the proposed work.
Application file for exterior facade repair work as per plan. there will be no change in the use, egress, or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story warehouse built in 1913, on a 19,010 sq ft lot.
- Built
- 1913
- Floors
- 6
- Residential units
- 0
- Building type
- Warehouse
- Land use
- Industrial and manufacturing
- Zoning district
- M1-5/R8A
- Lot area
- 19,010 sq ft
- Building area
- 104,334 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 33 notices on file; the most recent was issued Jul 27, 2026.
- Construction
Issued Jul 27, 2026 — EMERGENCY WORK ORDER-IMMED HAZ CONDITION OBSVD @ ALL STREET EXPOSURES AT EXP1 BRICK MASONRY CRACKS & SPALLING MASPNRY AT PARAPET. AT EXP2 OBSVD MASONRY CRACKS & MISSING/DAMAGED CORNICE. OWNER TO IMMED RETAIN DOB REG GC TO INSTALL S/W SHED. PROVIDE FULL WIDTH OF S/W @ EXP1/2/3 START WORK IMMED & CONTINUE DAILY UNTIL COMPLETE
- Low pressure boiler
Issued Dec 31, 2009
- Local law 62/91 - boilers
Issued Jan 1, 2009
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01449950-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01449950-I1
- BIN
- 2000137
- BBL
- 2022770010
- Postal code
- 10454 · 153 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 0
- Proposed dwelling units
- 0