What the filing says
A public-record reading of the proposed work.
The scope includes renovation of the base building chiller plant to include the removal of existing absorption chillers and system components in accordance with de-carbonization and modernization efforts for future replacement with electrical equipment.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story care home built in 1967, on a 79,125 sq ft lot.
- Built
- 1967
- Floors
- 8
- Residential units
- 0
- Building type
- Care home
- Land use
- Public facilities and institutions
- Zoning district
- R8A
- Lot area
- 79,125 sq ft
- Building area
- 216,559 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 7 notices on file; the most recent was issued Feb 22, 2023.
- No report and / or late filing (facade)
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
- Facade safety program
Issued Sep 6, 2016
- Facade safety program
Issued Sep 6, 2016
3 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01407517-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01407517-I1
- BBL
- 1018600020
- Postal code
- 10025 · 229 filings
- Review type
- Professional Certification
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 0
- Proposed dwelling units
- 0