What the filing says
A public-record reading of the proposed work.
Resolve ecb violations: 39163098r, 39163099z, 39163101z and 39163218m; to remove illegal extension at rear yard and renovation of existing cellar and 1st floor as per plan. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story one-family home built in 1925, on a 3,425 sq ft lot.
- Built
- 1925
- Last altered
- 2010
- Floors
- 1
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R3-1
- Lot area
- 3,425 sq ft
- Building area
- 875 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 2 notices on file; the most recent was issued Oct 8, 2025.
- Construction
Issued Oct 8, 2025 — ATOI OBSERVED A TWO STORY HORIZONTAL EXTENSION AT REAR. NO PLANS TO PROVIDE DETAILS ON FOUNDATION, FOOTING, FRAMING ETC. ALSO SECOND STORY ADDITION ON EXISTING BLDG HAS NO DETAILS ON SIZING OR SUPPORT. STRUCTURAL STABILITY IS IN QUESTION.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S01300704-P3.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 72,082 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S01300704-P3
- BBL
- 5040490043
- Postal code
- 10306 · 200 filings
- Review type
- Professional Certification
- Existing stories
- 1
- Proposed stories
- 1
- Existing dwelling units
- 1
- Proposed dwelling units
- 1