What the filing says
A public-record reading of the proposed work.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the NYC code 2022. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story office building built in 1910, on a 178,800 sq ft lot.
- Built
- 1910
- Last altered
- 2008
- Floors
- 5
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-2
- Lot area
- 178,800 sq ft
- Building area
- 367,472 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 9, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 140 notices on file; the most recent was issued Nov 6, 2025.
- Construction
Issued Nov 6, 2025 — STRUCTURE RENDERED NON-COMPLIANT DUE TO VEHICLE STRIKING SIDEWALK SHED AT THE CORNER EXPOSURE#1 AND 4. DISLODGING FOUR UPRIGHT COLUMNS, ARE BENT AND DISPLACED AT THE CORNER OF LAFAYETTE AND BARETTO STREET WITH 20 FOOT SECTION OF SWS PARTIALLY COLLAPSING. THE REMAINING 70 FEET ALONG BARETTO STREET IS LEANING WITH COLUMNS OUT OF PLUM.
- Construction
Issued Nov 4, 2025 — STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION. DAMAGE OBSERVED TO HAVE BEEN SUSTAINED. TRACTOR TRAILOR TRUCK STRUCK SIDEWALK SHED CAUSING APPROX 30 FEET OF SHED TO COLLAPSE ONTO SIDEWALK
- Construction
Issued Sep 5, 2025 — ENGINEERING REPORT REQUESTED DUE TO CRACKS IN BUILDINGS. IN INSIDE HRA OFFICE BEHIND SERVICE CENTER GUYS MECHANICAL ROOM AND IDF ROOM SEVERAL CRACKS MISSING BRICKS AND COLUMNS WITH VERTICAL CRACKS. SPALLING PAINT AND ROTTING, LENTILS FOR DOOR/WINDOWS.
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 9, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01413177-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01413177-I1
- BIN
- 2005939
- BBL
- 2027390015
- Postal code
- 10474 · 73 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 21
- Proposed dwelling units
- 21