What the filing says
A public-record reading of the proposed work.
Install debris chute fronting westchester and bryant avenue based on phase sequence as per plans filed. this is in conjunction with alt type i filing # x00980628.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story walk-up apartment building built in 1924, with 103 homes, on a 18,822 sq ft lot.
- Built
- 1924
- Floors
- 6
- Residential units
- 103
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7-1
- Lot area
- 18,822 sq ft
- Building area
- 81,708 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 21 notices on file; the most recent was issued Jul 10, 2024.
- Fail to certify class
Issued Jul 10, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Apr 30, 2024 — EMERGENCY WORK ORDER DUE TO SEVERE CRACKS AND MASONRY CRACKS ON EXP1 W ESTCHESTER AND EXP2 BRYANT AVENUE DAMAGED BRICKS.REMEDY:MAINTAIN EXTER IOR FACADE AND APPURTENANCES.ERECT SIDEWALK SHED ON EXP1 WESTCHESTER A ND EXP4 BRYANT AS PER 1RCNY 103.4
- Low pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 1, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01412516-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01412516-I1
- BIN
- 2006148
- BBL
- 2027500022
- Postal code
- 10459 · 213 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 104
- Proposed dwelling units
- 104








