What the filing says
A public-record reading of the proposed work.
Installation of temporary sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story warehouse built in 1920, on a 48,785 sq ft lot.
- Built
- 1920
- Floors
- 2
- Residential units
- 0
- Building type
- Warehouse
- Land use
- Industrial and manufacturing
- Zoning district
- M3-1
- Lot area
- 48,785 sq ft
- Building area
- 44,660 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 25 notices on file; the most recent was issued Aug 19, 2026.
- Construction
Issued Aug 19, 2026 — FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER. OBSERVED AT EXP 2 SPALLED/SPALLING BRICK, DAMAGED OPEN JOINTS. AT EXP 3 MISSING/SPALLING BRICK & UNSAFE OPEN WINDOWS. AT EXP 4, LONG VERTICAL CRACK ON BRICK & DAMAGED/CRACKED MORTAR JOINTS AT FIRST FLOOR. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Nov 10, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXP 1 DAMAGE JOINT AT 1ST FLOOR. EXPOSURE 3: SPALLED/SPALLING BRICKS, DAMAGE OPEN JOINTS.EXPOSURE 4 DEFECT A PARAPET AREAS AND UNSAFE WITH OPEN WINDOWS. REMEDY: REPAIR AND OR REPLACE
- Construction
Issued Nov 10, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: AT THE TIME OF INSPECTION AT EXPOSURE 1 DAMAGED AND CRACKED JOINTS AT FIRST FLOOR. AT EXPOSURE 3 WEST ELEVATION SPALLIING BRICKS, DAMAGED AND OPEN MORTAR JOINTS
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00040645-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00040645-I1
- BBL
- 3030560168
- Postal code
- 11206 · 2951 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








