122 East 61 Street

122 East 61 Street, Manhattan, NY 10065

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01138428-I1

122 East 61 Street

Manhattan, NY 10065

Alteration filing · status dated Sep 29, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
10
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01138428-I1 as a alteration filing at 122 East 61 Street, Manhattan, NY 10065. Its latest published status category is Approved, dated Sep 29, 2026. The filing records 10 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 29, 2026
Proposed scale
10 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 1041945Applicant of recordSee the 664 filings that name Fl&m Engineering Design &inspection
FiledNov 7, 2024
Current recordApproved
Proposed scale10 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01138428-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01138428-I1
BBL
1013950063
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
10
Proposed dwelling units
10
Scaffolding